Homepage | Set Home | Add to Favorites
Member

Zhejiang Holley International Co. Ltd


Products
  • No Category
Search
 

Friends links
  • No link

Three Phase Electro-mechanical Watt-hour Meter, DT58
Click image to view full size image
Product: Views:145Three Phase Electro-mechanical Watt-hour Meter, DT58 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-11-04 08:38
  Inquiry
Details
Model Number: HL- DT58 Brand Name: HOLLEY INTL Key Specifications/Special Features: Meter case: meets the protection requirements set by protection class IP53 of IEC60529Series types of cases and terminal covers are availableTerminals: connection terminals are made of nickel-plated brass with features of high mechanical strength, good conductivity and corrosion-resistanceTerminal block: terminal block is injection molded of heat- and fire-resistant bakelite, voltage test link can be located inside or outside of the meter caseDriving system: driving system employs three single electromagnet elements, all of which are mounted on the meter frame with three screws, each electromagnet element consists of voltage element, current element and connection board
  • Rotor: rotor shaft is turned of high strength aluminum alloy, upper end of the shaft is pressed with a worm which is made of thermoplasticand the lower end is embedded with a graphite bearing which is self-lubricate and friction-resistant to ensure long service life of the meter
  • Braking element: magnet is made of AlNiCo5 alloy and designed as U-shaped so that the effect of short time over currents upon the magnet is negligible
  • Temperature compensation plate, made of a special alloy, is embedded in the braking magnet, rotor speed can be adjusted largely and continuously by rotating the whole magnet
  • Frame: frame is die-cast by SiAl alloy, structure is designed as W-shaped of stable property to avoid distortionand its surface is treated with chromate to achieve reliable and durable coating against oxidation
  • Shipping Information:
    • FOB Port: Shanghai
    • Lead Time: 30 - 45 days
    Main Export Markets:
    • Asia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • North America
    • Western Europe

    Download more information about this product

    Inquiry